Construction site & 110V equipment testing frequency

PATtest4U™ are specialists in the field of Portable Appliance Testing and always use The Institute of Electrical Engineers (IEE) suggested initial frequency of inspection and testing of equipment, as published in their Code of Practice for In-service Inspection and Testing of Electrical Equipment.

The information on the suggested initial frequencies given below is more detailed and specific that the Health & Safety Executive (HSE) guidance, but is not considered to be inconsistent with it.

The following is the IEE’s Code of Practice for In-service Inspection and Testing of Electrical Equipment suggested initial frequency of inspection and testing of equipment for Construction Sites and 110V equipment.

Initial frequency of inspection and testing of equipment: Construction Sites & 110V Equipment
Type of Equipment
User Checks
Class I Formal Visual Inspection
(Note 1)
Class I Combined Inspection & Testing
Class II Formal Visual Inspection
(Note 1)
Class II Combined Inspection & Testing
Stationery
None
1 Month
3 Months
1 Month
3 Months
Information Technology
None
1 Month
3 Months
1 Month
3 Months
Moveable (Note 2)
Weekly
1 Month
3 Months
1 Month
3 Months
Portable (Note 2)
Weekly
1 Month
3 Months
1 Month
3 Months
Hand-held (Note 2)
Weekly
1 Month
3 Months
1 Month
3 Months

Please be advised of the various notes associated with the following table.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>